Construction specifications for wooden doors and w

2022-07-22
  • Detail

Wooden doors and windows are an important part of interior decoration and modeling, and also an important means to create decorative atmosphere and effect, accounting for a large proportion in modern decoration projects. Then, how to check and accept the wooden doors and windows? Today, Xiaobian will take you to know about the construction specifications of wooden doors and windows and the acceptance of wooden doors and windows

wooden doors and windows are an important part of interior decoration modeling and an important means to create decorative atmosphere and effect, accounting for a large proportion in modern decoration projects. Then, how to check and accept the wooden doors and windows? Today, Xiaobian will take you to know about the construction specifications of wooden doors and windows and the acceptance of wooden doors and windows

construction specifications for wooden doors and windows

(1) flush open wooden doors and windows: the installation procedures for installing flush open wooden doors and windows are as follows:

① before installing doors and windows, the installation position of door and window frames should be determined according to the horizontal line 500 mm from the ground and the coordinate datum line, pop up the installation position line, put the door and window frames in place on the installation position line, place them correctly, and temporarily fix them with a mold

② correct and straighten the door and window frames with a plumb bob and a level ruler, fix the door and window frames on the technical bricks embedded in the wall with 100mm nails, and nail the nail cap into the frame after flattening. There is no need to install a new door frame for the reconstruction of old doors and windows, but the door frame position should be popped out on the wrapped door pocket and nailed

③ lean the door and window sashes against the frame, and plan according to the height and width of the door. After reaching the specified standard, pick out the hinge groove, fix the hinge on the door and window sashes first, and then install it on the door and window frame. The position of hinge slot shall be accurate to prevent distortion after the door leaf is fixed

(2) suspended sliding wooden doors and windows: the suspended sliding doors and windows refer to the doors and windows opened by the sliding of the pulley on the upper part of the doors and windows and the lower part of the guide rail. Suspension type is mainly used for sliding doors. The installation procedure of suspended sliding wooden doors and windows is as follows:

① when installing the suspended sliding door, snap the line to determine the installation position line of the upper beam, side frame plate and lower guide rail according to the 500mm horizontal line and coordinate datum line. Fix the upper beam on the top of the door opening with screws. If there is a side frame plate, fix the side frame plate on the side of the wall of the opening with screws

② remove the bolts and nuts on the hanger, put them on the I-steel slide rail, and fix the I-steel slide rail on the bottom of the upper beam with screws. Fix the lower guide rail with expansion bolts or plastic expansion screws. When installing the door leaf, first install the suspension bolt into the special hole on the top of the riser on the door leaf, level the door along the lower guide rail with a wooden mold, and then fix the suspension bolt with the pendant with a nut. After checking that the door edge is consistent with the side frame plate, fix the door stop and install the veneer

(3) through sliding door and window: through sliding door and window refers to the sliding door and window with pulley at the bottom of the door and window, which is mainly used for the installation of sliding window. Its structure is shown in Figure 4-5. The installation procedure of the through sliding window is as follows:

① when installing the through sliding window, snap the line to determine the installation position of the upper, lower and side frame plates, fix the lower frame plate at the bottom of the hole with screws, fix the side frame plate at the side of the hole wall with screws, and fix the upper frame plate at the top of the hole with screws

② accurately mark out the installation position of the steel slide on the lower frame plate, use a fan shovel to pick out a wooden groove with the same thickness as the steel slide on the frame plate, and use adhesive to stick the steel slide in the wooden groove

③ when installing the window sash, first stick the special wheel box to the reserved hole under the lower rail of the window sash with adhesive. After installing the window sash on the track, check whether the gap between the window edge and the side frame plate is the same width up and down, and install the face after adjustment

correct procedures for door and window acceptance

1. Check the strength of doors and windows

how about the thickness, material, specification and sealing of doors and windows; Whether the material, specification and thickness of the window, the variety and thickness of the glass are safe, and whether the switch of the decoration design window is smart, convenient and airtight

2. Window checking function

a. the doors and windows are pushed and pulled smoothly, the surface is flat and smooth, without serious scratches, and the profile is not cracked or broken

b. Gold accessories: complete, in correct position and firm

c, sealing quality: when the doors and windows are closed, there is no obvious gap between the fans and the frames, and there is no looseness, falling off or exposure of the sealing strip

d, door and window frames, leaves are vertical and not bent

e, the glass is free of pollution and damage, the double glass interlayer is free of dust and moisture, and the separation strip is uniform

f. whether the drainage hole of the window is opened. If the water is not opened, it will flow into the profile

skills of door and window acceptance

1. Verticality of window frame: it is best to measure with a level ruler; You can also push and pull the window sash close to the window frame, leaving a little gap. At this time, you can see whether the gap between the upper, middle and lower parts is the same size. If the upper, middle and lower gaps are the same, it means that the window frame is installed vertically; On the contrary, the window frame is not vertical

2. Inspection of steel lining: put a magnet on the window you want to inspect, and it can be adsorbed on the window, which indicates that the manufacturer has added steel lining in the profile cavity, otherwise it has not added steel village. As for the thickness of the steel village, in addition to knowing in the processing plant, you can also listen carefully to the sound of the hammer hitting the steel village in the window frame when the installer fixes the window frame, and feel whether the penetration is laborious

3. Identification of true and false profiles: first, look at the protective film on the surface of profiles; Second, check whether there is an anti-counterfeiting mark (the so-called bar code) on the concave wall of the profile, dial the profile manufacturer's phone number on the protective film, and you can know the authenticity according to the prompt quotations

4. Whether the window sash walks on the window frame track smoothly and softly (this depends on the quality of the pulley)

5. Flat open series: whether it is light to open and close; Whether it is tight after closing

6. Whether the pushing and pulling of the screen window is light and whether the walking is stable

summary of the editor: the construction specifications of wooden doors and windows and the relevant contents of the acceptance of wooden doors and windows, which will be introduced by the editor first. Please continue to pay attention to more wonderful content